Moving And Shaking!

Today is a special day! Day 48 of summer. Counting forward there are 48 more days of summer before the first day of fall! Time to really take any summer activities we want to enjoy seriously! We’ve spent a lot of time working at the farm as July has turned into August. The rail system that now supports the farm cabin Little Red was completed shortly after my last post. I nervously began planning the move of the building which we have been calling the Warming Shack for the past several years. I designed a hitch system for the move planning on using my tractor. It was an epic fail despite the fact that my tractor hydraulics could lift the building slightly. I didn’t even try to drag it! It was time for plan B!

A frustrated Zane shakes his head.

Plan B was simple. We would use two tractors for a tandem hitch and drag. The real problem I predicted was how we would get the building onto the rails. But I kicked that can down the road. Our friend Gregger showed up the next day wanting to witness the move. He spotted my neighbor’s big John Deere backhoe and asked why we weren’t using it for moving the building. I explained that we could if I could get it started. Great idea! I parked my little 40hp New Holland 4wd next to it and realized just how right he was to suggest it! My tractor looked like a toy almost next to that behemoth! It’s loader even had chain hooks welded to it. It’s hydraulic cylinders that control the bucket are huge when compared to my tractor. I knew I had seriously underestimated the weight of the building from the start. Would my rail system even hold it? It was time for plan C as the old backhoe roared to life with a cloud of belched diesel exhaust.

The cabin meets its match!

We rigged two grade 70 road chains under the 6”x8” skids that support the cabin. I through bolted the chain to them after drilling them out. We were ready to roll! I lifted the heavy cabin easily with the backhoe’s loader. We were forced to stop work as yet another thunderstorm soaked the already soggy ground even more. Lightning flashes were getting too close for comfort! After the rain subsided I hopped on the backhoe and tried to back up with the elevated building. I moved a short distance but soon got to spinning on the wet ground. No problem I decided! I hitched my 4wd tractor to the backhoe for a tandem pull. Zane tried his best but all we both could do was spin. All was lost until the ground dried out I feared. Or was it? Gregger suggested curling the bucket of the backhoe while sitting stationary. It worked and I was able to drag the building a short distance. Little by little we inched the building forward and finally with both tractors spinning with screaming engines we picked up steady momentum and gained some speed. Once we had it moving it pulled easily.

Ripping and tearing! Down for a moment to reassess.

All was well until we reached the turn by the big barn. We took my tractor off the pull and reversed the backhoe. It easily pulled the building by itself on the firmer gravel of the driveway and the redistribution on weight to its back tires. I took it up onto the road and tried to get lined up with my marker stakes that I had set in place to align the building’s skids with my rails. I was able to get it close and decided to quit for the day while we were ahead. I was shot from all the nervous activity.

At the turn to reverse the hitch.

The next day I successfully managed to get the building onto my rail system using pipe rollers and the backhoe. I got it lined up and into its final resting place by the end of the day! Mission accomplished! The rail system was a success! The building was level and no further work was needed on the foundation. I anchored it down onto the rails and that was that!

The pipe rollers make short work of the task.

Everything had lined up perfect for the electrical conduit to be attached to the building. After a few hours of work the building had a functioning outlet to power the project. Now came a labor intensive part of the renovation.Repairing and packing out the porch. Putting down a subfloor and shortening the timber frame posts that were weather damaged. My cousin Gerry and Zane helped me with that and progress was made. The weather was conducive to productive work so that was nice. I started the curtain walls next with Zane’s help. They will surround the timber frame former facade that will now become an inner feature of the camp. Protected from the weather they will showcase the antique bar wood theme I am planning. That’s pretty much where we are at right now.

The porch is about to be closed in.

There’s a lot of other things going on while we work part time to advance the cabin. But moving the Warming Shack cabin was a milestone. Worthy of a blog post most certainly. I am so glad our good friend was there that day to help us with the move. Our years of construction have taught us many things. Rigging and moving heavy objects just a small part of that. There’s lots of work yet to do before the the building becomes Little Red. In the shadow of the monster barn we call Big Red it will become an integral part of our farm property experience. Working together on it is beneficial for Zane and I. As for what else we have going on it will show itself shortly. And btw! That woodshed we saved and moved? It’s going to be the new Warming Shack I decided! Little Red will be too nice for muddy maple syrup worker to mill around in!✍️

Posted in Family, Farm, Fun, People, Uncategorized and tagged , , .

Leave a Reply

Your email address will not be published. Required fields are marked *