Milling Around

This post was started awhile back and there were a few technical glitches that have since been resolved fortunately! It doesn’t take long for the central theme of a post to suddenly change direction some! I originally was staying in Saranac Lake when I began writing it but am currently here at Camp Edith getting it finished. I just got fully moved in this afternoon. Amy and I have been working at getting it cleaned and ready the past couple weeks.Thursday night was our first night here and we stayed here all weekend. It’s really shaped up with some TLC! Amy has done a wonderful job transforming the functionality of the space. It’s very cozy now! I had a lot of decluttering to do!Things have wrapped up mostly on the project in Saranac Lake and I will be spending more time back here now. It’s been a rewarding experience living and working in the village. There’s plenty of work to do at the farm and some catching up to do with miscellaneous things. I recently got a gel shot in my left knee to try to relieve some of my pain and discomfort. My meniscus injury may very well require surgery but I am postponing that for as long as possible. At this point it’s still unclear how the injury even happened but it may go all the way back to last November when Zane and I tipped over the side by side one night by accident while burning off the meadows across the road at the farm. It’s the only thing that I can think of really. That was a rather wild evening of burning! But we had everything under control! Mostly… but that’s another story all together. The focus now will be shifting to resetting the sawmill and getting some logs run through it. It’s been stored in the warehouse since it got back from Winthrop in late May. I got it back out and set it back up recently one Friday night after returning from Saranac Lake.

Burning off the pond holes.

Back in February I had cut logs with my friend Gregger in his big woods up behind his home in Winthrop. I stayed in his cabin for a night and we cut logs for a couple days. We targeted hemlock for me for my Homestead cabin siding. Four trees made a rather large pile of logs. For him we cut cherry and yellow birch. With the snow covered ground we made good progress and we’re soon finished with the project. The plan was to leave the logs till spring when we could bring the sawmill up to run them through.

Stacking the hemlock.

It was mid May before I finally got the mill up to Gregger’s. I packed some food and extra gear so I could spend a night in his cabin then work a second day without doing all the extra driving. We got the mill set up and Zane came up to help out. We got a few hardwood logs run through that first day before making a nice dinner of venison and fish. Zane spent the night at the cabin with me but had things to do the next morning. Gregger and I ran a bunch more logs through the mill and stickered all the lumber up on his trailer under a tarp. Rain was a little bit of an issue but we worked around it as best we could. By the end of day 2 we had made a decent start on the hardwood log pile.

Off we go!

There was a gap in our sawmill activity when Amy and I traveled for a long weekend to the Brimfield Flea Market in Massachusetts. It was quite the event! We ended up purchasing a number of things that easily fit into her car. We tried to buy sensibly but impulse purchases of collectibles can be difficult to control! While we were in Massachusetts we traveled to nearby Connecticut to tour her former hometown. Saturday would find us on the beach at Watchhill, Rhode Island. It’s a lovely sanctuary that has preserved and will remain undeveloped. There’s nothing like the ocean to stir the inner spirit. It was our first traveling experience together and we had a really great time!

Brimfield Flea Market.

May was moving right along and there was only one week left before the Saranac Lake deck project was slated to begin. It was obvious that Gregger and I could never finish sawing his hardwood logs and all of my hemlock. I decided to truck all my logs to the Homestead instead. So we sawed during the day and I hauled a load home every night. We cut up some of the hardwood slabs to weigh down the truck also. Cut into 10” chunks they were stored in the Homestead woodshed each night to dry for the tiny cabin wood stove to be used during the next heating season. We completed all of Gregger’s hardwood logs and some hemlock he needed before finally beginning to concentrate on cleaning up his landing. I hauled a couple big loads of slab wood to the Homestead for sugarwood as part of this process.It was time consuming and tedious work but one with a larger purpose. I was beginning to get a little road weary but stayed with the pace. The final morning would find me following Gregger as he trucked the sawmill back to the Homestead.

Headed back.

I had received an offer to pick up some hemlock logs from a friend of a friend over by Sixberry Lake awhile back. I had picked up one load the day we returned the sawmill to the Homestead and dumped them off in the meadow near the warehouse.The fellow who gave them to me wanted two 14’ 6×6’s in exchange for the logs. A very fair proposition to which I readily agreed! I hadn’t gotten them done however and his July deadline was fast approaching. I picked out three decent logs but ended up needing four as one turned out to be “shaky”. Wind shake causes the growth rings in hemlock to break out when sawn into lumber. It’s not super common but sometimes happens in hemlock. The boards and timbers fall apart when shake shows up. It’s a frustrating thing when it happens and often those pieces of lumber end up in the sugar house for firewood! I ended up making the fellow three decent 6×6 timbers and one decent 4×4 timber. It seemed fair. I loaded them onto the trailer and delivered them to him where he then loaded the second load of logs for me. Prior to that I had moved all the piles of logs in the meadow up onto the landing log loading platform above the actual sawmill.

Prepping for 6×6 sawing.

Prior to delivery of the timbers,Zane and I spent the better part of Monday last week getting some pine logs that were on the log loading landing run through the mill. The pine sawyer beetles had begun to bore into them just under the bark so it was time! A couple months later it would be a different story as the beetles would have gotten inside the logs boring destructive holes through them. Nature at its finest! Sawyer beetles serve as a frontline decomposer type process that helps dead pine return to the soil. It was hot and dusty work but we managed to produce some very nice lumber. All the slab wood was dumped off the tractor loader into the big outdoor pile right outside the sugar house woodshed. Another job for another day or days most likely! We may be a little behind schedule!😂

Moving slab wood to the sugar house.

I finally got tired out from sawing and hand peeled the last three pine logs. They won’t be bothered by the beetles with their bark gone. The lumber was stickered and stashed away in the old woodshed and in the warehouse. We had to stack and haul all the dry sap buckets that had been sitting in the woodshed for weeks first though. That’s done finally at least. Lots of task oriented work to get done. I finally called it quits but felt very happy with our accomplishments. We had done a lot! It felt good getting caught up a little and working with the sawmill! Nothing like accomplishment to stir the inner spirit and charge the batteries! All that slab wood will be used for making maple syrup. Talk about repurposing! It all seemed a little time consuming. Last winters log cutting in Winthrop. Sawing logs there as payment for the hemlock logs I got from Gregger. Hauling those hemlock logs to the Homestead from Winthrop. Then turning around and going after more hemlock logs at Sixberry Lake. And all those hemlock logs still needed to be sawn! Was it really worth all the time and effort? Why not just side the buildings with vinyl siding or rough cut pine? It represents something much larger to me however. It’s all connected in some way that many people might struggle to understand. Hemlock is gone from the farm property where it once thrived. Locked in the buildings themselves in the form of timbers, rafters, and siding. To use hemlock to transform the farm buildings and the tiny cabin seemed justified in that moment to me. Who would buy siding or lumber when the means to create it lay within my grasp? What price do I place on my goals and dreams? I have insisted on hemlock siding for my building projects and hemlock we shall have in large plentiful quantities. I will create each piece with a driven mindset of determination. The time I will have invested in creating the lumber will be significant. But so will be the MOONTABS that led to its creation. That is the very level of resolve and stubborn perseverance. There is prideful rural heritage in the tasks at hand and in the deeds themselves. It will be remembered and visible long beyond this moment. That is where the message lies if indeed there is a message at all. Perhaps I simply underestimated the very magnitude of the job itself. What does it truly matter in the end? When all is finished and slab wood burns in the evaporator from those same logs what will I think then? I will know that answer I hope if I am to be so fortunate. I will be residing within those hemlock shrouded walls of the tiny cabin and standing in front of my boiling evaporator yet another March day. Why ask so many questions anyway? What is time anyway? I will never get it all done anyway say the teachings of Abraham-Hicks. It’s an inner calling these things I desire to do. It is enough.✍️

Incoming hemlock logs.
Posted in Conservation, Family, Farm, Heritage, Uncategorized and tagged , , , , , , , .

Leave a Reply

Your email address will not be published. Required fields are marked *